List of Completed Projects
Sr | Project Title | Client | Scope of Work | Year |
---|---|---|---|---|
1 | Demolition of Flow Sunction Tank (FST-804) and Installation of New Flow Sunction Tank (FST-205) Project | China Petroleum Engineering & Construction Corporation Abu Dhabi Branch (CPECC) | GRE/GRV piping installation works - 6 | 2016 |
2 | BARKA Independent Water Project, Barka, Oman | Suez International | GRE/GRV piping installation works - 1 | 2016-2017 |
3 | RAFA3 Desalination Plant Piping project, Qatar | Toyo-thai Corporation | GRV/GRE Piping Installations Works 1 | 2015-2017 |
4 | Helium 3 Drainage Piping Project | Draieh contracting | GRE Piping installation and testing works 4 | 2017 |
5 | Hyundai Potable water modification project, Qatar | Hyundai Engineering | 60 | 2016-2017 |
6 | RAFA2 Desalination Plant Piping project | Mitsubhishi Corporation / Hitachi Zosen | GRV/GRE Piping Installations Works 1 | 2015-2017 |
7 | Dolphin - Industrial Wate Management Project | Qatar Engineering (QCON) | GRV Piping Installation Works for IWMP Project | 2016-2017 |
8 | Umm Al Houl Power Project | Samsung C&T | GRV/PVC Piping Installations & testing works 1" to 60" | 2016-2017 |
9 | Umm Al Houl Power Project | Hitachi Zosen | Underground Piping Erection Works. 1/2 | 2015-2017 |
10 | Umm Wuál Phosphoric Acid Plant Projects, Turaif, KSA | Gulf Asia Coontracting Company L.L.C. | GRP Piping works- 4 | 2016 |
11 | Umm Wuál Phosphoric Acid Plant Projects, Turaif, KSA | Hanwha Engineering & Construction | GRE/GRV piping, 1"-100", 450,000 total Dia Inch, 400,000 Dia Inch A/G. | 2014-2017 |
12 | RL Emergency & Safety College project -QP | SEG - Q | GRE Piping Installation works 3" to 24" | 2010-2013 |
13 | RLIC Potable Water Storage Tanks & Pumps | Hassan Juma Backer | GRE/GRV Piping Installation works 6" to 36" | 2013 |
14 | Takreer RRE Project PKG #2, Ruwais Abu Dhabi | GS Engineering | GRE/GRV Piping Installation works 1 | 2013 |
15 | West Qurna Field Phase 2nd Project (Accomodation Area)- Iraq | YoomYung E&C | GRE/GRV Piping Installation works 4 | 2013-2014 |
16 | West Qurna Field Phase 2nd Project - Iraq | Samsung Enginerring | GRE/GRV Piping Installation works 1 | 2013-2014 |
17 | QAFAC Sea Water revamp shutdown works | Steam Qatar (Salam group) | GRE/GRV Piping Installation works 8 | 2014 |
18 | Hyundai Potable Water Modification Project | Hyundai Engineering | GRE/GRV Piping Installation works - 60 | 2014 |
19 | Offshore Installation and Onshore Fabrication Services | Maersk Oil Qatar | 3-year contract for services whenever required | 2010-2014 |
20 | Dolphin Onshore Gas FRP maintenance contract | Dolphin Energy Limited | Fiberglass Pipe Repair Maintenance contract | 2012-2017 |
21 | Barzan On-shore Project - Ras Gas | Descon / JGC | Modification Works Site Instructions | 2014 |
22 | Dolphin EGC upgrade project | Simplex / L&T | GRE/GRV Piping Installation works 4 | 2014 |
23 | Polysilicon Project | Punj Lloyd Limited | GRE/GRV Piping Installation works 6 | 2013-2014 |
24 | EPC for Well head Tie-In Works in Sahil / ASAB Projects | Punj Lloyd ADCO | Installation of GRE Piping using treaded pipes. | 2013-2014 |
25 | Carbon Black & Delayed Cooker Project, Ruwais, Abu Dhabi | Samsung Enginerring | GRE/GRV Piping Installation works | 2013-2015 |
26 | Dolphin OBL | Qatar Engineering & Const. | Installation, Lamination and Testing of GRP Pipes | 2010 |
27 | RL Oryx GTL | Madina Group WLL | Installation of GRP Piping | 2010 |
28 | Shuweihat S2 IWPP | Future Pipe Industries | GRE/GRP Lamination works | 2009-2010 |
29 | QAPCO LDPE 3 | Tekfen Construction | GRE/GRP Piping Installation works | 2010-2011 |
30 | Prefabrication of Spools for BEWR01 | Maersk Oil Qatar | Prefabrication / Spooling of GRP materials | 2010 |
31 | RL Emergency and Safety College | SEG - Qatar | Installation, Lamination and Testing of GRP Pipes | 2010 |
32 | Prefabrication of Spools at Sarplast Factory in Qatar | Sarplast Qatar WLL | Prefabrication of GRP Spools from 25mm to 1200mm | 2010 |
33 | Bulk Fuel Facilities - Department of Military Works | Gulf Eternit Industries Co. Ltd. | Erection and Cementing of GRE Pipes and Fittings | 2010 |
34 | ASAB Full Field Development Project | Al Jaber Energy Services | GRE/GRP Piping Installation works | 2010-2011 |
35 | Takreer Pkg 3 Utility and Offsite Project | Samsung Engineering | GRE Piping Installation works ( 1.5" to 120" - Total 395,000 Dia-Inch ) | 2010-2013 |
36 | Fiberglass Pipe Repair Service Ras Laffan | Dolphin Energy Limited | Fiberglass Pipe Repair Maintenance | 2007-2011 |
37 | Common Sulfur Project, Qatargas II, Ras Laffan, Qatar | Al Jaber Energy Services, Qatar | Management of Installation and Jointing of above and underground RTRP Epoxy Resin Piping | 2007-2009 |
38 | EPIC of Desalinated Water network Phase II Ras Lafan Contract No. GTC/07/147/ED | Black Cat Engineering & Construction | FRP Pipe Installation Works | 2007-2009 |
39 | Borouge 2 Ethylene Project Ruwais, UAE | Consolidated Contractors International Company (CCC) | Supply of tools, qualified manpower and supervision to carryout the jointing of GRE/GRP pipes for Fire Water / Cooling Water / Drainage and Sewage lines. | 2007-2010 |
40 | Common Sulfur Project, Qatargas II, Ras Laffan, Qatar | Al Jaber Energy Services, Qatar | Installation of Granulator Sunshade Roof Drain | 2008-2009 |
41 | Fujairah F2 IWPP Project | Alstom Power Services | Erection work of GRP pipes | 2008-2009 |
42 | SNC Lavalin Qatalum Project | Al Jaber Engineering, Qatar | Installation of GRE/GRP piping | 2008-2010 |
43 | EMAL KPIZ Project | Archirodon Construction Co. | GRP Lamination works | 2009-2010 |
44 | Fujairah Veolia | Sarplast Iniziative Industriali | Pre-fabrication / Spooling of GRP materials | 2008-2009 |
45 | TR Borouge 2 Project | IMECO | GRE/GRP piping installation works | 2009-2010 |
46 | Mechanical Erection of RO Package Fujairah 2 Project | Deutsche Babcock Energie | GRE/GRP Lamination works | 2009 |
47 | Dolphin CLSCSEF Tank Farm Expansion | Qatar Engineering & Construction | Installation and testing of GRP pipes | 2009 |
48 | QAPCO Soft Cooling Water System | Qatar Vinyl Company | Installation of GRE drain points (tie-ins) | 2009 |
49 | Qatalum Project - Quench Ducts | Asut Fiberglass | Quench Flange Lamination works | 2009 |
50 | Qatalum FTP 0500 Project Fume Treatment Plant | Solios Environnement SA | GRP Lamination works | 2009 |
51 | Fujairah Water and Power Plant Chlorination Plant | Doosan Heavy Industries Engineer: Fitchner | Fabrication, installation, hydro testing, and site QA/QC of GRV U/G and A/G pressure piping system dia. 25mm to 600mm. Lamination and flanged joints. | 2002-2003 |
52 | ADIA Upgrading Fire Protection System ADNOC Distribution Fuel Depot | Mutawa Trading and Gen. Contracting Engineer: Mott MacDonald Pipe Manufacturer: FPI | Fabrication, installation, hydro testing, and site QA/QC of GRE U/G fire fighting system dia. 100mm to 400mm. Cement, RSLJ, and flanged joints. | 2003 |
53 | Fujairah Water and Power Plant MSF UNITS | Future Pipe Industries (FPI) Main Contractor: Doosan Heavy Industries, South Korea Engineer: Fitchner | Installation, hydro testing, and site QA/QC of GRE/GRV U/G and A/G pressure piping system dia. 50mm to 1700mm. RSLJ and lamination joints. | 2003 |
54 | Fujairah Water and Power Plant - RO Plant | Ondeo Degremont Engineer: Fitchner Pipe Manufacturer: FPI | Modification of existing 400mm dia. GRE pipelines to introduce/relocate equipment. Lamination. | 2003 |
55 | Vessel Mystras | Dubai Drydocks Pipe Manufacturer: Ameron Bondstrand | Fabrication, installation, and hydro testing GRE A/G pressure piping system dia. from 50mm to 400mm. Tapered, cement, and flanged joints. | 2003 |
56 | Vessel X1 KOMBA | Dubai Drydocks Pipe Manufacturer: Ameron Bondstrand | Fabrication, installation, and hydro testing GRE A/G pressure piping system dia. from 50mm to 400 mm. Tapered, cement, and flanged joints. | 2003 |
57 | Fujairah Water and Power Plant - Potable Water Plant | Doosan Heavy Industries Engineer: Fitchner Pipe Manufacturer: Extraco | Fabrication, installation, hydro testing, and site QA/QC of GRV U/G and A/G pressure piping system dia. 25mm to 500mm. Lamination and flanged joints. | 2003-2004 |
58 | Fujairah Water and Power Plant - RO Plant - Shutdown Works | Ondeo Degremont Engineer: Fitchner Pipe Manufacturer: FPI | Remove cracked GRE flanges 1100mm dia. Repositioning displaced sections and installation of new flanges. Lamination and flanged joints. | 2003-2004 |
59 | Fujairah Water and Power Plant Rerouting GRV Piping in MSF UNITS | Future Pipe Industries (FPI) Main Contractor: Doosan Heavy Industries Engineer: Fitchner | Remove existing spools. Installation, hydro testing and site QA/QC of GRV A/G piping system dia 450mm. Lamination and flanged joints. | 2004 |
60 | Fujairah Water and Power Plant Replace Bosung GRV Piping in MSF UNITS | Future Pipe Industries (FPI) Main Contractor: Doosan Heavy Industries Pipe Manufacturer: Abu-Dhabi | Remove existing spools. Installation, hydro testing, and site QA/QC of GRV A/G pressure piping system dias. 600/450/350 mm. Lamination and flanged joints. | 2004 |
61 | Vessel DSV Eclipse | Arab Heavy Industries Pipe Manufacturer: Conley | Fabrication and installation of GRE A/G piping system dia. to 250mm. Cement and flanged joints. | 2004 |
62 | Vessel HAM 316 | Van Oord Gulf FZE Pipe Manufacturer: Ameron Bondstrand | Fabrication and installation of GRE A/G piping system dia. 50mm. Quicklock cement joints and flanged joints. | 2004 |
63 | Vessel HAM 317 Seawater Flushing Lines | Ballast Ham Dredging Pipe Manufacturer: Ameron Bondstrand | Fabrication, installation, and hydro testing GRE A/G piping system dias. 80/100/300/350 mm. Tapered, cement, and flanged joints. | 2004 |
64 | Fujairah Water and Power Plant - RO Filter Water Pump Discharge Spool | Ondeo Degremont Engineer: Fitchner Pipe Manufacturer: FPI | Cut existing 750mm flange. Rotating, relamination, and hydro testing. | 2004 |
65 | DN 1000mm Twin Lines in Al Ain for PVT Department | Future Pipe Industries (FPI) Main Contractor: Al Nassar Irrigation Engineer: Tebodin | Lamination of 1000, 800, 600, and 300mm dia. joints | 2004 |
66 | Fujairah Water and Power Plant RO Plant - Shutdown Works | Future Pipe Industries (FPI) Main Contractor: Doosan Heavy Industries Engineer: Fitchner | Replace approx. 120 nos. flanges dia. 200mm to 1100mm. Replace damaged dia. 1100mm elbows. Repositioning displaced lines. Hydro testing. Lamination, cement, and flanged joints. | 2004 |
67 | Fujairah Water and Power Plant RO Plant | Doosan Heavy Industries Engineer: Fitchner Pipe Manufacturer: FPI | Rerouting and hydro testing dia. 40mm and 80mm GRE lines. | 2004 |
68 | Ruwais Housing Complex | ADNOC | Repair 300mm and 400mm dia. cement joint on GRE pipe | 2004-2005 |
69 | Vessel Volvox Atalanta | Van Oord Gulf FZE Pipe Manufacturer: Ameron Bondstrand | Supply, fabricate, and install GRE A/G piping system dia. 40mm to 125 mm. Quicklock cement joints, lamination, and flanged joints. | 2005 |
70 | ADCO - Asab Facilities Upgrade Closed Drain and Produced Water System | Lead Contracting and Trading Main Contractor: Technip Pipe Manufacturer: FPI | Fabrication, installation, and hydro testing of GRE piping dia. 50mm to 400mm. Tapered, cement, and flanged joints. Test pressure 57 bar g. | 2005 |
71 | Fujairah Water and Power Plant Product Minimum Flow Line | Doosan Heavy Industries Pipe Manufacturer: FPI | Supply and installation for re-routing of 600mm dia. GRV piping lamination joints | 2005 |
72 | Vessel HAM 310 | Van Oord Gulf FZE Pipe Manufacturer: Ameron Bondstrand | Installation and hydro testing of flushing pumps spools. Changing flush water CS piping to GRE. | 2005 |
73 | Vessel Ham 317 | Van Oord Gulf FZE Pipe Manufacturer: Ameron Bondstrand | Supply, fabricate, and install GRE A/G piping system dia. 40mm to 125mm. Quicklock cement joints, lamination, and flanged joints. | 2005 |
74 | Jebel Ali Station K Phase II Power Plant | ENELPOWER | Lamination 3" GRP Pipeline | 2005 |
75 | Sohar Methanol Project - Seawater Lines | Future Pipe Industries (FPI) Main Contractor: Oman Proman | Installation, hydro testing, and site QA/QC of GRV U/G seawater lines dia. 1800mm. Lamination joints and flanged joints. | 2005 |
76 | Vessel Rotterdam - Gland/Flushing and Cooling Water Lines on Deck, Pump Room, and Engine Room | Van Oord Gulf FZE Pipe Manufacturer: Ameron Bondstrand | Supply, fabricate, and install GRE A/G piping system dia. 40mm to 900mm. Quicklock Cement joints, lamination, and flanged joints. | 2005-2006 |
77 | Ras Laffan B Power and Water | Larsen and Toubro Qatar LLC Main Contractor: Siemens Pipe Manufacturer: FPI | Installation and hydro testing of GRE/GRV piping dia 600mm to 2000mm. Lamination and flanged joints. | 2005-2006 |
78 | Dolphin Upstream and Compression Facilities | DODSAL PTE Ltd. Main Contractor: JGC Pipe Manufacturer: FPI | Cement jointing pipes and spools dia. 50mm to 600mm. | 2005-2006 |
79 | ORYX GTL Ras Laffan | Lahoud Engineering Pipe Manufacturer: Sarplast | Jointing pipes and spools dia. 25mm to 450mm. lamination joints | 2005-2006 |
80 | Dolphin Upstream and Compression Facilities | Taisei Corporation Main Contractor: JGC | Cement jointing pipes and spools dia. from 150mm | 2005-2006 |
81 | OPQL ISND Phase II Expansion PS-1K | Doha Petroleum Construction Co. Ltd. | Supply technicians/equipment for GRE jointing works. | 2005-2006 |
82 | Idd El Shargi Field PS-1K | Occidental Petroleum of Qatar Ltd. (OXY) | PS-1K Seawater Overboard Dump By-pass Tie-ins and GRE Pipe work Repairs dia. 1" to 24" | 2006 |
83 | Vessel HAM 318 | Van Oord Gulf FZE Pipe Manufacturer: Ameron Bondstrand | Supply, fabricate, and install GRE A/G piping system to dia. 200mm. Quicklock cement joints, and flanged joints. | 2006 |
84 | Vessel Volvox Delta | Van Oord Gulf FZE Pipe Manufacturer: Ameron Bondstrand | Supply, fabricate, and install GRE A/G piping system to dia. 200mm. Quicklock cement joints, and flanged joints. | 2006 |
85 | Total E & P Safety Improvement Halul Island J-14713 | Doha Petroleum Construction Co. Ltd. | Onshore prefabrication & offshore hook-up of GRE spools | 2006 |
86 | Vessel Ham 310 | Van Oord Gulf FZE | Repairs of glandline; modification flushing pipe | 2006 |
87 | Ras Laffan B Water Pipeline | Consolidated Contractors Int'l. Co. SAL (CCC) | Installation and hydro testing GRP line dia. 1600mm | 2006 |
88 | W4/LNG1 Ras Laffan Common Cooling Water for CCIC and Qatar Petroleum | Gulf Eternit Industries LLC (GEI) | Lamination of 1100mm to 1500mm dia. GRE fittings | 2006 |
89 | Ras Laffan Ph-B Power Plant | Al Hasoun Sejong Mechanical Est. Pipe Manufacturer: Ameron Bondstrand | Installation of 900mm dia. GRE pipes and fittings. | 2006 |
90 | Ras Laffan Ph-B Independent Water and Power Remineralisation and Chlorination Plant | Doosan Heavy Industries Pipe Manufacturer: Sarplast | Installation of 900mm dia. GRE pipes and fittings. | 2006 |
91 | Vessel Olympia | Van Oord Gulf FZE | Supply and installation of GRE piping | 2007 |
92 | New Maintenance Building Project 530-4012 R1 | Qatar Kentz | Supply of Manpower and supplies | 2007 |
93 | QVC Seawater Project | Qatar Vinyl Corporation Ltd. | Construction sevices for installation of 52" GRE seawater piping in instrument pit, replacement of 52" flange, reapir of diagnosed damages. Hydrostatic leak test | 2007 |
94 | QAFAC Methanol Plat Revamp Project | Archirodon Construction (Overseas) Co. | Installation, Testing and Commissioning of GRP/GRE Pipes and Fittings | 2007 |
95 | MO 3000 Sohar Metahnol Project | Oman Pro Man Contracting & Trading LLC. | Repair of fiber glass pipes 20'' sea water line & 10'' acid line, installation of 20'' epoxy flange,ASA 150 lbs, dia 500 mm. | 2007 |
96 | WF Fire Water Line, Messaied | Qatar Egineering & Construction Company | Fabrication and Hydro-testing of the Fire Water line to WF Specs. | 2007 |
97 | Pearl GTL PI - II3 | Al Jaber & Partners Constructions & Energy Projects (WLL) | Application of GRE lamination to the pipes and fittings including hydrotesting | 2007 |
98 | WF Fire Water Line, Mesaieed | Qatar Engineering & Construction Company WLL | Cutting and Jointing of GRP Pipes on AF Docks | 2007 |
99 | Sohar Desalination Project | Al-Hassan Engineering Co.(S.A.O.G) | Supply of lamination of pipe joints, 25 mm to 400 mm dia. | 2007 |
100 | EPIC of Heavy Fuel Oil Bunkering for WOQOD at Ras Laffan | Maritime Industrial Services Co.Ltd.Inc. | Installation of GRP pipes and fittings. | 2007 |
101 | Total E & P Safety Improvement Halul Island J-14713 | Doha Petroleum Construction Co. Ltd. | Onshore prefabrication & offshore hook-up / installation of GRE piping / supply of manpower and tools | 2006-2007 |
102 | Oman Aromatics Project | Al-Hassan Engineering Co.(S.A.O.G) | Supply of lamination of pipe joints, 25 mm to 400 mm dia. | 2007 |
103 | Dolphin Upstream and Compression Facilities | Dodsal PTE Ltd | Supply of manpower with tools and shackles for GRE works | 2006-2007 |
104 | Sohar Power Plant Project (L62 + L51) (Rehabilitation & Re-Works) | Alstom Power Services (Overseas) | Rehabilitation of Export Water Line (flushing & pigging); 250mm dia pipe re-works | 2007 |
105 | VHFL Terminal Phase 5 Expansion | the C.A.T. Group | GRE jointing works / supply of manpower, tools, consumbles | 2007 |
106 | Vessel Terranova | Van Oord Gulf FZE | Supply and installation of GRE piping | 2007 |
107 | Vessel Ham 217 | Van Oord Gulf FZE | Supply and installation of GRE piping | 2007 |
108 | Vessel Ham 310 | Van Oord Gulf FZE | Supply and installation of GRE piping | 2007 |
109 | ASAB Gas Development Project Phase II | Future Pipe Industries - Abu Dhabi | GRE pipes installation works | 2007-2008 |
110 | QCS Potable Water Line Project Ras Laffan | Turki Bin Thabit Trading & Contracting Co. | Installation works including hydrotesting | 2007-2008 |
111 | Ras Laffan Central Kitchen | Shaqab National Catering Company | GRP pipe works for fire water line | 2007-2008 |
112 | Sohar Power Plant Project (L62 + L51) | Future Pipe Industries (QCJSC) Main Contractor: Alstom | Jointing of 2200mm GRP lines using lamination joint Jointing of 250-400mm dia pipe line using cement joint | 2005-2007 |
113 | Ras Laffan Desalination B IWPP | Future Pipe Industries (QCJSC) Main Contractor: Doosan Heavy Industries | Turn-key Installation and hydro testing of GRE/GRV piping to dia. 40mm - 2200mm. Works include fabrication and lamination of elbows, tees of dia 1300 - 2200. joints included cement, lamination and flanged connection. | 2005-2007 |
114 | 85TPH Boiler Project | Qatar Vinyl Company Ltd. | Installation of 16" fire water ring for Boiler Project | 2007-2008 |
115 | QAPCO 44'' Sea water Line Mesaieed | Descon Engineering Qatar LLC | Install & Hydrotest 44'' dia sea water line from Qatofin tie-in flange connection with a tie-in on existing wye lateral flange | 2007-2008 |
116 | EPIC of LPG Bottling Plant for WOQOD at New Industrial Area | Doha Petroleum Construction Co. Ltd. | Installation of GRP pipe systems (buried) - Fire Water and Potable Water System | 2008-2009 |
117 | Barka II Desalination Plant | Abu Dhabi Pipe Factory/Sarplast, Oman | Pre-fabrication / Spooling of GRP materials | 2007-2008 |
118 | Sea Water Pump Discharge Piping | Qatar Vinyl Company Ltd. | Installation of redesigned 52" Sea Water Pump Discharge piping | 2008-2009 |
119 | RL Project - B Desalination Plant | Doosan Heavy Industries & Construction Co. LTD. | GRP Modification work for Drain pit | 2008 |
120 | Qatofin Project - Mesaieed | Archirodon Constructions (Overseas) Co. S.A. | Installation and testing of GRP pipes | 2007-2008 |
121 | TR Borouge 2 Project Ruwais, UAE | IMECO | Fabrication and installation of GRE tie-in joints | 2009 |
122 | Vessel Ham 310 | Van Oord Gulf FZE | Supply and installation of GRE piping ( Sea water cooling lines, pump room) | 2009 |
123 | Vessel Volvox Delta | Van Oord Gulf FZE | Supply and installation of GRE piping ( Sea water cooling lines, pump room) | 2009 |
124 | RL B Distillate System,Qatar PR ? 20070530 - 001 | Doosan Heavy Industries and Construction Co. Ltd. | Supply of GRP Pipe Installation works including Hydrotest | 2007-2009 |
125 | Offshore Platform for Qatar Gas | Qatar Engineering & Construction | GRE pipings and fittings bonding job | 2007-2009 |
126 | Fire Hydrants for VPSA Project | Qatar Vinyl Company Ltd. | Tie in Installation of Firewater piping | 2009 |
127 | Pearl GTL Project, Qatar | Ammico Contracting Co. | Installation of GRE pipeline systems | 2008-2009 |
128 | Prefabrication of Spools for EAT104 Project | Maersk Oil Qatar | Pre-fabrication / Spooling of GRP materials | 2009 |
129 | Prefabrication of Spools for ABCW01 Project | Maersk Oil Qatar | Pre-fabrication / Spooling of GRP materials | 2009 |